This operation in the state of Chihuahua was opened in 2013 and can produce 15000tonnes/day. In this context, Minera Real de Angeles opted for four
Indeed, what they required was to have highly efficient machines, able to work in extremely harsh conditions and travel on very bumpy dirt roads with 20-30° degree slopes, in a particularly humid microclimate. The new 3500 TC machines have proved an efficient solution to reach even hard to access areas of the operation safely. Moreover, they have helped to increase the operation's concrete productivity.
Mexico motorway opening
Mexico’s Carretera Palmillas - Apaseo el Grande motorway connection is now open to traffic. The highway cost US$380 million to construct and connects the Mexico-Querétaro highway with the Bajío region. The 86km section of the route was built by ICA for the SCT. The new road link will carry 15,000 vehicles/day, running from Palmillas - Apaseo El Grande.
The route was opened by Mexico’s president, Enrique Peña Nieto and the new highway is now called "Centenario de la Constitución". This A4 category route allows vehicles to travel at speeds of up to 110km/h.