Istanbul’s third Bosporus bridge forms part of the north Marmara highway project’s Odayeri-Paşaköy section. The tender was awarded to a consortium comprising Turkish company IC İçtaş and Italian firm Astaldi.
The new bridge will be built to the north of the two existing structures and will connect Garipçe district on the European side with Poyrazköy district on the Asian side. When the new bridge is complete it will carry all trucks and heavy-duty vehicles. The two existing bridges over the Bosporus have a combined capacity of 250,000 vehicles/day but generally carry some 600,000 vehicles/day.
Both Hyundai E&C and SK Engineering & Construction are headquartered in South Korea. Hyundai E&C has carried out a series of major transport projects around the world including the Gyeongbu Expressway, Machang Grand Bridge, the Penang Bridge Packages 3,4 and 5 and the Jamuna Multipurpose Bridge. Currently, it is in charge of many distinctive overseas projects such as Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project and