The relocation was handled during May 2012, and comprised a total of just under 1,000 lorry loads. The new plant is on a 17ha site next to the airport, one of the most modern and largest compact construction machine factories in the world, with a covered area of 48,300m2. In addition, the new location houses an ultramodern production hall with a total of six assembly lines and an in-house testing ground, a paint shop with powder coating and a sandblasting unit, along with an office building. It also has an in-house apprentice workshop, a testing area and a service workshop for training purposes. The new site also increased the workforce to 520 with the addition of 200 new jobs.
The relocation was handled during May 2012, and comprised a total of just under 1,000 lorry loads. The new plant is on a 17ha site next to the airport, one of the most modern and largest compact construction machine factories in the world, with a covered area of 48,300m2. In addition, the new location houses an ultramodern production hall with a total of six assembly lines and an in-house testing ground, a paint shop with powder coating and a sandblasting unit, along with an office building. It also has an in-house apprentice workshop, a testing area and a service workshop for training purposes. The new site also increased the workforce to 520 with the addition of 200 new jobs.